Finding better ways to provide the materials the world needs
Our business
We operate in 35 countries where our 57,000 employees are working to find better ways to provide the materials the world needs
Our purpose in action
Continuous improvement and innovation are part of our DNA
Innovation
The need for innovation is greater than ever
We supply the metals and minerals used to help the world grow and decarbonise
Iron Ore
The primary raw material used to make steel, which is strong, long-lasting and cost-efficient
Lithium
The lightest of all metals, it is a key element needed for low-carbon technologies
Copper
Tough but malleable, corrosion-resistant and recyclable, and an excellent conductor of heat and transmitter of electricity
Bringing to market materials critical to urbanisation and the transition to a low-carbon economy
Oyu Tolgoi
One of the most modern, safe and sustainable operations in the world
Rincon Project
A long-life, low-cost and low-carbon lithium source
Simandou Project
The world’s largest untapped high-grade iron ore deposit
Providing materials the world needs in a responsible way
Climate Change
We’re targeting net zero emissions by 2050
Nature solutions
Our nature-based solutions projects complement the work we're doing to reduce our Scope 1 and 2 emissions
Decarbonisation progress update
We have a clear plan on decarbonisation - find out more about our progress in 2024
We aim to deliver superior returns to our shareholders while safeguarding the environment and meeting our obligations to wider society
Acquisition of Arcadium Lithium
Bringing our scale, development capabilities and financial strength to the Arcadium Lithium portfolio
Get the latest news, stories and updates
Things you can't live without
Our podcast discussing what needs to happen to create a sustainable future for the everyday items we have come to rely on
The 'f' word of innovation
How unlocking innovation requires a change of mindset
Reducing titanium oxide's carbon footprint
Our BlueSmelting technology could drastically reduce carbon emissions during ore processing
Discover more about life at Rio Tinto
Graduates and students
If you want to drive real change, we have just the place to do it
Empowering families with flexibility
Supporting new parents of any gender with equal access to parental leave
Available jobs
Join our team
PERTH, Australia--(BUSINESS WIRE)-- Rio Tinto has delivered first ore from the Gudai-Darri iron ore mine as the company brings online its first greenfield mine in the Pilbara, Western Australia, in more than a decade. Gudai-Darri will help underpin future production of the company’s flagship Pilbara Blend™ product.
The first autonomous AutoHaul™ trains loaded with ore from Gudai-Darri’s process plant have travelled the new 166-kilometre rail line that connects to Rio Tinto’s existing rail and port infrastructure. Production from the mine will continue to ramp up through the remainder of this year and is expected to reach full capacity during 2023.
Since ground was broken in April 2019, more than 14 million workhours have resulted in the movement of over 20 million cubic metres of earth, batching and placement of 35,000 cubic metres of concrete, and the installation of 10,000 tonnes of steel. The development of Gudai-Darri supported more than 3,000 jobs during the construction and design phase. The mine will support around 600 ongoing permanent roles.
With an expected life of more than 40 years and an annual capacity of 43 million tonnes, Gudai-Darri will underpin future production of Pilbara Blend ™ product. A feasibility study to support an expansion of this new hub is also progressing.
The mine’s commissioning and ramp-up is expected to increase Rio Tinto’s iron ore production volumes and improve product mix from the Pilbara in the second half of this year. Full-year shipments guidance for 2022 remains at 320 to 335 million tonnes (100% basis) subject to risks around the ramp up of new mines, weather and management of cultural heritage.
The capital cost for the mine is estimated to be $3.1 billion (A$4.3 billion). As disclosed in February, the company’s replacement projects in the Pilbara, including Gudai-Darri, were subject to potential capital increases of approximately 15% due to ongoing COVID-19 restrictions, including labour access and supply chain quality issues. Group capital expenditure guidance for 2022 is unchanged at around $8 billion.
Rio Tinto Iron Ore Chief Executive Simon Trott said “The commissioning of Gudai-Darri represents the successful delivery of our first greenfield mine in over a decade, helping to support increased output of Pilbara Blend , our flagship product. It sets a new standard for Rio Tinto mine developments through its deployment of technology and innovation to enhance productivity and improve safety.
“I’d like to acknowledge the support of the Traditional Owners, the Banjima People, on whose country Gudai-Darri is situated. We have worked closely with the Banjima People to progress this project and we look forward to continuing to actively partner with them into the future.”
Rio Tinto Chief Technical Officer Mark Davies said “The safe and successful delivery of Gudai-Darri, in the midst of a global pandemic, is testament to the resilience and hard work of thousands of Rio Tinto employees and contractors, including a range of local Western Australian suppliers, as well as Pilbara Aboriginal businesses.
“In building this new hub we have brought together the best of our innovations, including autonomous trucks, trains and drills, as well as the world’s first autonomous water trucks, to make Gudai-Darri our most technologically advanced iron ore mine.
“This suite of autonomous assets complements the planned deployment of other leading-edge technologies including a robotic ore sampling laboratory, field mobility devices for all personnel and a digital asset of the fixed plant, which, together with data analytics, will make Gudai Darri safer and more productive.”
Helping support Rio Tinto’s carbon emission reduction targets, Gudai-Darri will be powered by a 34 megawatt solar farm that is expected to supply about a third of the mine’s average electricity demand once construction is complete in August.
Together with a new lithium-ion battery energy storage system in Tom Price, the solar plant is estimated to reduce annual carbon dioxide emissions by about 90,000 tonnes compared to conventional gas powered generation, equivalent to taking about 28,000 cars off the road.
This announcement is authorised for release to the market by Steve Allen, Rio Tinto’s Group Company Secretary.
riotinto.com
View source version on businesswire.com: https://www.businesswire.com/news/home/20220614005515/en/
Please direct all enquiries to media.enquiries@riotinto.com
Media Relations, UK
Illtud Harri M +44 7920 503 600
David Outhwaite M +44 7787 597 493
Media Relations, Americas
Matthew Klar T +1 514 608 4429
Investor Relations, UK
Menno Sanderse M: +44 7825 195 178
David Ovington M +44 7920 010 978
Clare Peever M +44 7788 967 877
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885
Media Relations, Australia
Jonathan Rose M +61 447 028 913
Matt Chambers M +61 433 525 739
Jesse Riseborough M +61 436 653 412
Investor Relations, Australia
Amar Jambaa M +61 472 865 948
Rio Tinto Limited Level 7, 360 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404
Category: Pilbara
Source: Rio Tinto
How we process personal data provided or obtained through this website.
With the exception of the use of cookies, Rio Tinto generally does not seek to collect personal data through this website. However if you choose to provide personal data to Rio Tinto through this website (for example, by sending us an email), we will process that personal data to answer your query and if relevant, to manage our business relationship with you or your company. We won't process that personal data for other purposes except where required to meet our legal obligations or otherwise as authorised by law and notified to you.
If you choose to subscribe to our media releases or other communications, you can unsubscribe at any time (by following the instructions in the email or by contacting us).
With your consent, our website uses cookies to distinguish you from other users of our website. This helps us to provide you with a good experience when you browse our website and also allows us to improve our site. A cookie is a small file of letters and numbers that we store on your browser or the hard drive of your computer if you agree. Cookies contain information that is transferred to your computer's hard drive.
As some data privacy laws regulate IP addresses and other information collected through the use of cookies as personal data, Rio Tinto’s processing of such personal data needs to comply with its Data Privacy Standard (see Part 1 of our Privacy Policy), and also applicable data privacy laws.
With the exception of the use of cookies (explained below), Rio Tinto generally does not seek to collect personal data through this website. However if you choose to provide personal data to Rio Tinto through this website (for example, by sending us an email), we will process that personal data to answer your query and if relevant, to manage our business relationship with you or your company. We won't process that personal data for other purposes except where required to meet our legal obligations or otherwise as authorised by law and notified to you.
Part 1 of this Privacy Policy contains the Rio Tinto Data Privacy Standard, which provides an overview of Rio Tinto’s approach to personal data processing. There is additional information in the appendices to the Data Privacy Standard, including information about disclosures, trans-border data transfers, the exercise of data subject rights and how to make complaints or obtain further information relating to Rio Tinto’s processing of your personal data.
If you choose to subscribe to our media releases or other communications, you can unsubscribe at any time (by following the instructions in the email or by contacting us at digital.comms@riotinto.com).
With your consent, our website uses cookies to distinguish you from other users of our website. This helps us to provide you with a good experience when you browse our website and also allows us to improve our site.
A cookie is a small file of letters and numbers that we store on your browser or the hard drive of your computer if you agree. Cookies contain information that is transferred to your computer's hard drive.
As some data privacy laws regulate IP addresses and other information collected through the use of cookies as personal data, Rio Tinto’s processing of such personal data needs to comply with its Data Privacy Standard (see Part 1 of this Privacy Policy), and also applicable data privacy laws.
These Cookies are used to provide a better user experience on the site, such as by measuring interactions with particular content or remembering your settings such as language or video playback preferences.
These Cookies allow us to analyse site usage in order to evaluate and improve its performance. They help us know how often you come to our site and when, how long you stay and any performance issues you experience whilst you are on our site.
These Cookies are used by advertising companies to inform and serve personalised ads to your devices based on your interests. These Cookies also facilitate sharing information with social networks or recording your interactions with particular ads.