Finding better ways to provide the materials the world needs
Our business
We operate in 35 countries where our 57,000 employees are working to find better ways to provide the materials the world needs
Our purpose in action
Continuous improvement and innovation are part of our DNA
Innovation
The need for innovation is greater than ever
We supply the metals and minerals used to help the world grow and decarbonise
Iron Ore
The primary raw material used to make steel, which is strong, long-lasting and cost-efficient
Lithium
The lightest of all metals, it is a key element needed for low-carbon technologies
Copper
Tough but malleable, corrosion-resistant and recyclable, and an excellent conductor of heat and transmitter of electricity
Bringing to market materials critical to urbanisation and the transition to a low-carbon economy
Oyu Tolgoi
One of the most modern, safe and sustainable operations in the world
Rincon Project
A long-life, low-cost and low-carbon lithium source
Simandou Project
The world’s largest untapped high-grade iron ore deposit
Providing materials the world needs in a responsible way
Climate Change
We’re targeting net zero emissions by 2050
Nature solutions
Our nature-based solutions projects complement the work we're doing to reduce our Scope 1 and 2 emissions
Decarbonisation progress update
We have a clear plan on decarbonisation - find out more about our progress in 2024
We aim to deliver superior returns to our shareholders while safeguarding the environment and meeting our obligations to wider society
Investor seminars
Our Investor seminar will be held in London on 4 December, and our Decarbonisation update on 5 December
Get the latest news, stories and updates
Things you can't live without
Our podcast discussing what needs to happen to create a sustainable future for the everyday items we have come to rely on
The 'f' word of innovation
How unlocking innovation requires a change of mindset
Reducing titanium oxide's carbon footprint
Our BlueSmelting technology could drastically reduce carbon emissions during ore processing
Discover more about life at Rio Tinto
Graduates and students
If you want to drive real change, we have just the place to do it
Empowering families with flexibility
Supporting new parents of any gender with equal access to parental leave
Available jobs
Join our team
LONDON--(BUSINESS WIRE)--Rio Tinto has committed $2.4 billion to the Jadar lithium-borates project in Serbia, one of the world’s largest greenfield lithium projects. The project remains subject to receiving all relevant approvals, permits and licences and ongoing engagement with local communities, the Government of Serbia and civil society.
The Jadar project would scale up Rio Tinto’s exposure to battery materials, and demonstrate the company’s commitment to investing capital in a disciplined manner to further strengthen its portfolio for the global energy transition.
Jadar will produce battery-grade lithium carbonate, a critical mineral used in large scale batteries for electric vehicles and storing renewable energy, and position Rio Tinto as the largest source of lithium supply in Europe for at least the next 15 years. In addition, Jadar will produce borates, which are used in solar panels and wind turbines.
Jadar will be one of the largest industrial investments in Serbia, contributing 1% directly and 4% indirectly to GDP, with many Serbian suppliers involved in the construction of the mine. Rio Tinto is committed to help develop local businesses so that they can support the operation over the coming decades. It will also be a significant employer, creating 2,100 jobs during construction and 1,000 mining and processing jobs once in production.
Rio Tinto Chief Executive Jakob Stausholm said “We have great confidence in the Jadar project and are ready to invest, subject to approvals. Serbia and Rio Tinto will be well-positioned to capture the opportunity offered by rising demand for lithium, driven by the global energy transition and the project will strengthen our offering, particularly to the European market. It could supply enough lithium to power over one million electric vehicles per year1.
“The Jadar deposit and its unique mineral, Jadarite, discovered by Rio Tinto geologists in 2004 contains high-grade mineralisation of boron and lithium, supporting a long-life operation in the first quartile of the cost curve for both products.”
“We are committed to upholding the highest environmental standards and building sustainable futures for the communities where we operate. We recognise that in progressing this project, we must listen to and respect the views of all stakeholders.”
Rio Tinto continues to work with a wide group of local and global experts across all aspects of the environmental, social and governance impacts and has done so for many years. For example, to date we have finalised 12 environmental studies and more than 23,000 biological, physical and chemical analyses of air and water. This consultation is ongoing and will continue to inform our final submissions for approval.
The Jadar development will include an underground mine with associated infrastructure and equipment, including electric haul trucks, as well as a beneficiation chemical processing plant. To minimise the impact to communities, it will be built to the highest environmental standards, including utilising dry stacking of tailings. This innovative method allows the dry tailings to be progressively reclaimed with vegetation and soil with no need for a tailings dam. Water management will be state of the art with a dedicated facility resulting in approximately 70% of raw water coming from recycled sources or treated mine water.
First saleable production is expected in 2026 at a time of strong market fundamentals with lithium demand forecast to grow 25-35% per annum over the next decade. Following ramp up to full production in 2029, the mine will produce ~58,000 tonnes of lithium carbonate, 160,000 tonnes of boric acid (B2O3 units) and 255,000 tonnes of sodium sulphate2 annually, making Rio Tinto one of the top ten lithium producers in the world. Based on this annual production of lithium carbonate, Rio Tinto aims to produce 2.3 million tonnes of lithium carbonate over the expected 40-year life of mine.
The next steps for the project are seeking an exploitation licence and receipt of regulatory approvals. This includes approval of the environmental impact assessment (EIA) studies, which will shortly be made available to the public for comment. The EIA is required for the commencement of works, with construction targeted to start in 2022.
1 Assuming 60kWh battery size
2 These production targets were previously reported in a release to the Australian Securities Exchange (ASX) dated 10 December 2020, “Rio Tinto declares maiden Ore Reserve at Jadar” (for battery-grade lithium carbonate it was 55,000 tonnes). All material assumptions underpinning the production targets continue to apply and have not materially changed.
This announcement is authorised for release to the market by Steve Allen, Rio Tinto’s Group Company Secretary.
riotinto.com
View source version on businesswire.com: https://www.businesswire.com/news/home/20210727005910/en/
Please direct all enquiries to media.enquiries@riotinto.com
Media Relations, UK
Illtud Harri M +44 7920 503 600
David Outhwaite M +44 7787 597 493
Media Relations, Americas
Matthew Klar T +1 514 608 4429
Media Relations, Australia
Jonathan Rose M +61 447 028 913
Matt Chambers M +61 433 525 739
Jesse Riseborough M +61 436 653 412
Investor Relations, UK
Menno Sanderse M: +44 7825 195 178
David Ovington M +44 7920 010 978
Clare Peever M +44 7788 967 877
Investor Relations, Australia
Natalie Worley M +61 409 210 462
Amar Jambaa M +61 472 865 948
Rio Tinto plc
6 St James’s SquareLondon SW1Y 4ADUnited Kingdom
T +44 20 7781 2000Registered in EnglandNo. 719885
Rio Tinto Limited Level 7, 360 Collins StreetMelbourne 3000Australia
T +61 3 9283 3333Registered in AustraliaABN 96 004 458 404
Category: Jadar
Source: Rio Tinto
How we process personal data provided or obtained through this website.
With the exception of the use of cookies, Rio Tinto generally does not seek to collect personal data through this website. However if you choose to provide personal data to Rio Tinto through this website (for example, by sending us an email), we will process that personal data to answer your query and if relevant, to manage our business relationship with you or your company. We won't process that personal data for other purposes except where required to meet our legal obligations or otherwise as authorised by law and notified to you.
If you choose to subscribe to our media releases or other communications, you can unsubscribe at any time (by following the instructions in the email or by contacting us).
With your consent, our website uses cookies to distinguish you from other users of our website. This helps us to provide you with a good experience when you browse our website and also allows us to improve our site. A cookie is a small file of letters and numbers that we store on your browser or the hard drive of your computer if you agree. Cookies contain information that is transferred to your computer's hard drive.
As some data privacy laws regulate IP addresses and other information collected through the use of cookies as personal data, Rio Tinto’s processing of such personal data needs to comply with its Data Privacy Standard (see Part 1 of our Privacy Policy), and also applicable data privacy laws.
With the exception of the use of cookies (explained below), Rio Tinto generally does not seek to collect personal data through this website. However if you choose to provide personal data to Rio Tinto through this website (for example, by sending us an email), we will process that personal data to answer your query and if relevant, to manage our business relationship with you or your company. We won't process that personal data for other purposes except where required to meet our legal obligations or otherwise as authorised by law and notified to you.
Part 1 of this Privacy Policy contains the Rio Tinto Data Privacy Standard, which provides an overview of Rio Tinto’s approach to personal data processing. There is additional information in the appendices to the Data Privacy Standard, including information about disclosures, trans-border data transfers, the exercise of data subject rights and how to make complaints or obtain further information relating to Rio Tinto’s processing of your personal data.
If you choose to subscribe to our media releases or other communications, you can unsubscribe at any time (by following the instructions in the email or by contacting us at digital.comms@riotinto.com).
With your consent, our website uses cookies to distinguish you from other users of our website. This helps us to provide you with a good experience when you browse our website and also allows us to improve our site.
A cookie is a small file of letters and numbers that we store on your browser or the hard drive of your computer if you agree. Cookies contain information that is transferred to your computer's hard drive.
As some data privacy laws regulate IP addresses and other information collected through the use of cookies as personal data, Rio Tinto’s processing of such personal data needs to comply with its Data Privacy Standard (see Part 1 of this Privacy Policy), and also applicable data privacy laws.
These Cookies are used to provide a better user experience on the site, such as by measuring interactions with particular content or remembering your settings such as language or video playback preferences.
These Cookies allow us to analyse site usage in order to evaluate and improve its performance. They help us know how often you come to our site and when, how long you stay and any performance issues you experience whilst you are on our site.
These Cookies are used by advertising companies to inform and serve personalised ads to your devices based on your interests. These Cookies also facilitate sharing information with social networks or recording your interactions with particular ads.